Mechanical Engineer

QAR 12,000

I have been working in the field of Engineering with a total 10 years of Working Experiences in Construction & Maintenance Industry, involving with the wide horizontal infrastructure /utilities and vertical project for MEPFS works, like in malls, showroom, industrial plants, factory, hospitals, apartments, & hotel. etc. with different location, local and abroad.

Listing ID: 9905c7674328a03c

Additional Info

First NameManuel
Last NameGabriel
Phone No66702342
EducationMechanical Engineer
Field of StudyBachelor of Science in Mechanical Engineering
College or UniversityTarlac State University
Time Period2000-2008
Job TitleMechanical Engineer

Work Experience

WORK EXPERIENCES

I-MOHAMMED HAYIL GROUP 2015 -2019

Doha - Qatar
Project Assignment:

1. 3 Building 3B+G+5F Building Fox Hills Lusail
Job Title: HVAC Engineer

Job Description
 Check HVAC IFC Drawing to Shop Drawing if there is some discrepancies.
 Check shop drawing before submit.
 Check & review the HVAC builders work.
 Raise RFI for some discrepancies from HVAC BOQ to IFC Drawings.
 Check the coordination drawings of all services.
 Take off HVAC System Material as IFC vs BOQ
 Write and make material request.
 Ensure the installations of duct accessories as per approved drawing.
 Monitor & check the installation of AHU & FCU
 Monitor & check the Chiller Installation
 Monitor & Check the Cooling tower installation
 After installation submit Inspection request.
 Monitor & Check drawing if there is an obstruction or rerouting of Duct as per site condition and submit drawing proposal and for execution with consultant inspection.
 Check & monitor the chilled water line
 Ensure that all chilled waterline accessories properly installed ( valves , air pressure releasing valve , by pass,
 Monitor and check the installation of chilled water line and Test
 Check the HVAC Sleeves installations and submit Inspection Request
 Coordinate to civil contractor for demolition cutting opening of wall for duct sleeves or by providing the sleeve box especially on the shear wall.
 Planning and make weekly activity plan.
 Make daily distribution of manpower as per Civil contractor Schedules
 Coordinate to the consultants & other services to the mock up sample before continue for the installation & execution.
 Proposing some possible solution if there is a clashing of duct & chilled water pipe to the other trade for the lesser work.

2. 3200 Units Affordable Housing Projects Salwa Road
Job Title : INFRA- Site Engineer

Job Description
 Check the IFC of INFASTRUCTURE Works/ Utilities
 Check the INFRA Drawing before consultants submission
 Take off the pipe of Potable water Network, & accessories
 Take off the pipe Irrigation Network, & accessories
 Take off the pipe of Foul Water Network
 Take off the pipe of Storm water Network
 Check the materials submittals of all infra works.
 Ensure the installation of Potable & Irrigation Pumps as per approved materials specification.
 Ensure the installation of Potable water system as per approved shop drawings
 Ensure the installation of Irrigation network as per approved shop drawings.
 Submit daily welding report of HDPE pipe to the consultant.
 Coordinate to the civil contractor for the sand beddings and compaction of pipe.
 Check also the line tag before complete pipe backfilling.
 Make pressure test with 12 bar maximum of Potable water & 10 Bar Irrigation network.
 Monitor and check Foul water & Storm Network Service.
 Take off Drainage System Material as per approved material submittals
 Monitor & Check drawing if there is an obstruction or rerouting of pipe as per site condition and submit drawing proposal and for execution with consultant inspection.
 Check & monitor the installation of GRP pipe 1000mm- 700mm diameter.
 Coordinate to surveyor for the pipe elevation from upstream to down dream before backfilling.
 Conduct Ait test of all pipe UPVC & GRP pipe 100 mm of H2O
 Check the installation Potable, Irrigation GRP tank & accessories as per approved drawings.
 Ensure the installation of water meter cabinet as per approved Karahma regulations.
 Make weekly planning & look ahead schedules.
 Distribute daily manpower activates together with foreman.
 Make daily report

3. Showroom Phase -1 & 2
Job Title : Fire Fighting Site Engineer

Madinat Mawater Project
Job Description

 Check the drawings of IFC Fire Fighting network form Fire Pump Room to sprinkle systems & fire Hose Cabinet.
 Check the shop drawing before submission.
 Take off the Fire Fighting Network of underground pipe, gate valves, dismantling joints, Pressure gauge.
 Monitor the installation of Fire Hydrants,
 Submit daily welding report of HDPE pipe to the consultants.
 After installation conduct pressure test 16Bar & submit IR.
 Take off the firefighting pipe, fittings & accessories in the building.(Fire Pump Pump 10MPA, Electrical Pump & jockey Pump )zone control valve , flow meter . fire alarm valve., inspector valve, supervisory switch, sprinkle head., fire hose cabinet, fire extinguisher,& fire Department
 Check all materials of firefighting as per approved material submittals & QCCD before start the installations.
 Ensure the installation of accessories as per QCCD approved.
 Make sure the distance of all sprinkle head the same in the drawings.
 Ensure support & bracket is properly installed.
 Check the alignment of pipe & support.
 After installation of pipe and branch conduct pressure test 16Bar.& submit Inspection request.
 After area by area pressure test connect the line from INFRA to the building & test 16bar and submit Inspection request.
 Flushing all network then make initial testing by the consultants before QCCD authority for the final test.
 Ensure the installation of Fire hose cabinet as per QCCD approved.
 Ensure Fire Extinguisher & fire blanket is properly installed as per architect recommend.
 Monitor contractor for the installation of FM-200
 Conduct joints inspection from electrical & mechanical, submit Inspection request after initial pass from the contractor.
 Coordinate to other trade prior to start all firefighting networks.
 Coordinate to civil main contractor for the sleeving opening the network in wall or in the underground crosses the beam.
 Coordinate to the contractor and suggesting some solution to solve site problems of clashing to the other services.

4. 22 & 40 Villa Project
Sokohama –Doha
Job Title &: Mechanical Site Engineer

Job Description
 Check Plumbing & Drainage Works,
 Check IFC drawing and the BOQ given.
 Raise RFI if there are some discrepancies for IFC to BOQ.
 Check Drawing before submission.
 Take off Plumbing materials & accessories
 Rake off Drainage materials.
 Make material request.
 Check the booster pump and all accessories when delivered to site.
 Monitor the installation of plumbing & drainage line as per approved drawings.
 Submit Inspection & pressure test 10 bar for ppr plumbing & gravity test for drainage line after installation
 Ensure the installation of plumbing fixtures as per architectural approval.
 Ensure that installation of drainage has have slope as per consultant recommended and project specification.
 Make gravity test the bathtub before final fixed.
 Ensure the installation of water meter cabinet is approved by karahama.
 Make sure drainage installation has have vent pipe as per project specifications.
 Check the installation of water tank on the rook and testing.
 Check the installation of booster pump & its accessories.
 Coordinate the flint of water tank size & booster pump concrete pad.
 Submit Inspection request after installation
 Submit Materials inspection request when materials received from the supplier and also check if asper approved materials submittals.
 Coordinate to the consultant if there is encountered problem in the site and suggest possible solution that any services will distract.
 Make planning and scheduling of works.
 Make Daily Progress Report

4. 37 Villa Project
Hilal, Doha
Position: Mechanical Engineer

Job Description
 Take off Plumbing System Material as per approved material submittals
 Take off Drainage System Material as per approved material submittals
 Take off HVAC system materials as per approved material submittals
 Monitor & Check drawing if there is an obstruction or rerouting of pipe as per site condition and submit drawing proposal and for execution with consultant inspection.
 Check the Shop Drawings of Plumbing works
 Check the Shop Drawings of Drainage Works
 Check the Drawings of HVAC Works
 Ensure that our scope of work in MEP has been executed properly with quality installations output.
 After installation of all services submit Inspection request to the consultants.
 Ensure all duct installation as per approved drawings.
 Conduct smoke test for the duct and submit Inspection request
 Ensure the installation of water tank booster pump are installed properly.
 Conduct testing and commissioning of pumps.
 Submit progress report to the company.
 Check the installation of lifting pump,
 Testing & commissioning of umps with the supplier and representative of the consultant .

II – ISOMETRIC PHILIPPINES 2013 - 2015

AYALA MALL
Antipolo Rizal
Position :Project Incharge

Job description

 Estimate the Project Cost of MEPFS
 Estimate and monitor all the variation orders.
 Monitor the Installation of Ducting of air-conditioning system and insulation materials...
 Monitor the installation of all equipment fans and motor of the project.
 Monitor and check the capacity of blower that is consultant recommended before the installation.
 Monitor the installation of chilled water pipes of from AHU.
 Quantify the pipes valves and insulations need in actual requirements
 Check and Review the pumps capacity for the Design of all pump going the chiller, pumps and cooling tower of the project.
 Monitor and check the installation of AHU
 Monitor and Check the drawings of HVAC System.
 Monitor and check the drawings of the Plumbing works
 Monitor and check the drawings of Fire Protection Systems
 Direct Coordinate to the consultants if there is a concerned regarding the drawings.
 Monitor and check all the shop drawings of MEPFS
 Making progress billing to reconciled to the consultant for approval

III – ARABIAN GULF COMPANY 2011 - 2013

Jeddah -Kingdom of Saudi Arabia(King Fahd Hospital)
Mechanical Facilities Engineer

Job description
 Supervise and Monitor all job order requested by the clients.
 Inspection and estimate the quantity of materials that will need to be purchase or repair.
 Report and discuss to ministry Engineer if there is a pending job order.
 Choices proposal for approval of the client to do or closed the job order soon.
 Technical references for trouble shooting of the equipment and facilities.
 Distribute daily manpower activities
 Make schedule for the priority requested by the clients
 Direct report to the ministry about the sub- contractor project
 Ensure the quality and test the efficiency of the AHU Installed in the Hospital
 Technical references to all pumps and blowers and air con to be need to buy
 Ensure the quality of chilled water entire the hospital that weekly check by the sub-contractor about the chemical mixture.
 Making Procedures of Preventive Maintenance with different frequency
 Assigning of utility operator schedule monthly for three shift per day.
 Schedule of maintenance the fans, blowers & pumps.
 Check & monitor the chilled water chemical mixtures
 Check & monitor the Reverse Osmosis plant
 Assign Manpower for 3 shifting operator for R.O.Plant, Boiler, Heat Exchanger, AHU,FCU, AC, Chiller, Cooling Towers.
 Monitor the laundry shop.
 Monitor and check all facilities of the hospitals
 Daily monitor and make report for the centralized water heater of the hospital
 Assigned daily visual inspector all pumps primary and secondary pumps,
 Daily check all lifting pump of the hospitals.

III- STEEL CENTER PHILIPPINES INC. 2010 - 2011

Pasig City-Philippines
Project Engineer

Job description
 Ensure the quality and design structure of the project during erection.
 Monitor the ship mark installed at corresponding places and erection plan
 Monitor the report of Quality Control officer.
 Monitor the report of Safety officer
 Monitor the incoming delivery at site.
 Monitor the erected materials
 Monitor the daily manpower distributions
 Directly reporting to head office whatever problem encountered at project Site.
 Monitor the incoming new erection drawing and revisions.
 Directly coordinates to the Japanese for the project design revisions and daily accomplishment report.
 Representative for daily meeting to the Japanese Gen. Contractor.
 Compute the man hour per tons of the project
 Planning and scheduling of daily work activities to catch up the schedule

PROJECT Accomplishments

1.Yokohoma Tire Philippines Clark , Pampanga(Piping installation and Pipe rack)

2. AT Steel Warehouse
Clark, Pampanga

IV - GREENMETAL INDUSTRIES INCORPORATION 2009-2010

Batching Plant & Crashing Plant
Cainta, Rizal - Philippines
Position : Project Engineer

Job Description

 Ensure the quality and design installation of electrical, mechanical and piping installation.
 Monitor the report of quality control officer.
 Monitor the report of Safety officer
 Monitor the incoming delivery at site then follow up immediately if have problem in the delivery.
 Monitor the erected materials and electrical installed.
 Monitor the daily manpower distributions
 Directly reporting to head office whatever problem encountered at project
 Monitor the incoming new erection drawing.
 Directly coordinates to the Japanese for the project design revisions and daily accomplishment report.
 Representative for daily meeting to the Japanese Gen. Contractor.
 Project scheduler and look a head schedule.
 Supervise the belt splicing of conveyor.
 Submit daily report to the company.

V - D&L CONSTRUCTION 2008 - 2009

HHS-Tower
Job Title : Office Engineer

►Job Discription
 Site Planning & Scheduling
 Look ahead schedule
 Manpower daily distribution
 Ensure Mechanical works executed as per approved drawings.
 Services clashing in site make proposed design for consultant approval
 Ensure HVAC works is implemented according to approved drawings.
 Ensure materials to be installed for Mechanical works as per approved material submittals.
 Ensure Plumbing works as per approved shop drawings.
 Ensure Drainage Works installation as per approved shop drawings .
 Ensure materials to be installed for HVAC as per approved materials.
 Coordinate to the consultant for Inspection
 Check the delivery of incoming materials at site.
 Check balance materials as per delivery not vs LPO
 Make Materials request for the materials of Mechanical Works
 Make materials request for the HVAC Works.
 Submit Inspection Request to the consultant
 Submit materials inspection request.
 Submit Request for information